Day 57, in the event of this catastrophe fire loss.... 2010-08-11 13:59:36
Day 57, in the event of this catastrophe fire loss....
Today, we had reach an agreement with the insurance company, which is about 11% higher than their original estimate, and is about 8k less than what my estimate is, both side compromised a little.
We had already started the demolition process, already haul out five 50 yard hoppers.
I am trying to survive most of the lower floor, except some interior walls, because we are re-arrange the floor plans from 7 two bedroom, 1 one bedroom, to 1 four bedroom, 2 three bedroom, 1 two bedroom, 3 one bedroom, and 1 studio.
Major construction will start 4 weeks from now.